PRESSUREGAUGEONLY LOGO.png

Revival Brewery Company supplies a distinctive craft beer experience that appeals to everybody. It is a renewal of brewmaster Sean Larkin’s ardour for unique and revolutionary craft beers, cultivated over twenty years of creating signature brews for the preeminent breweries in Rhode Island.
Though he’d been excited about hanging out on his own for a couple of years, it was an introduction to avid home brewer Owen Johnson in late 2009 that set in movement what would become Revival. After many nights of brainstorming, Revival Brewery Company determined to reinvent itself in a post-pandemic world with the timeless combination of beer and pizza. The owners created Revival Brewing and Lost Valley Pizza, a brewpub and pizzeria positioned in the Valley neighborhood of Providence, Rhode Island.
After reopening the brewpub in a brand new building, the house owners had varied projects lined as a lot as enhance the area, including extra bogs and a new bar space.
However, the brewery’s new location posed a tough plumbing situation. According to Geoff O’Leary, owner of O’Leary Plumbing and Heating, they’d initially deliberate to put in traditional underground drain lines, however “during the initial development of the brewery, they utilized an area without any plumbing plans available, so we had no idea what the plumbing setup looked like,” explains O’Leary.
“We knew there have been drain strains within the floor, but we didn’t know where we needed to install the restrooms or the bar space,” he continues. “We later realized the concrete was three ft thick, making any new plumbing set up notably difficult and expensive.”

PROBLEM

Thankfully, O’Leary knew of a product he had been using over the entire span of his twenty-year plumbing profession: Saniflo’s above-floor plumbing pumps, an answer that would allow them to put in plumbing without having to interrupt via that 3-inch-thick concrete to put in new drain traces.
“I’ve been utilizing Saniflo’s residential line of macerator pumps since it was first introduced within the United States,” says O’Leary, who serves the Eastern, North, and South Shores in Massachusetts offering residential and business plumbing companies.
After presenting the challenges they have been facing on the brewery to producers representative Walter F. Morris, they introduced him to Saniflo’s industrial line of drain pumps and raise stations. digital pressure gauge ’s Sanicom 2 to handle the drainage for a model new bar area. Walter F. Morris also beneficial Saniflo’s Sanicubic 2 to handle two unisex restrooms. Down the line, the brewery confronted additional issues once they had to add a sink close to the pizza oven per the Health Board’s request and, once more, when they lastly started the development of the new bar area.
SOLUTION

After studying more about Saniflo’s Sanicom 2 business drain pump and the Sanicubic 2 raise station, O’Leary knew it will remedy the brewery’s unique concrete trenching points.
“The Sanicubic set the usual for the brewery and helped out tremendously, because we might go from one workers rest room to offering two loos for the public,” O’Leary explains.
After efficiently opening and providing the mandatory facilities to prospects, the brewery needed to add a hand sink near the pizza oven. O’Leary explains there have been no drain pipes available close sufficient to the oven, so they needed to discover one other Saniflo solution. O’Leary determined to install the Saniswift drain pump, which enabled them to tie into the present drain line, located above the doorway virtually 30 feet away from the new hand sink.
Soon after, Revival Brewing and Lost Valley Pizza was prepared to start the development of the new bar area. The bar would include two washing machines, a three-base sink, and ice bins. The new Sanicom 2 served because the plumbing answer for the bar area. The Sanicom 2 is a heavy-duty duplex drain pump designed for functions requiring grey water elimination for industrial wants.
Recently launched into the market, the Sanicom 2 comes equipped with a pair of 2-horsepower, 220-volt motors for dealing with a number of commercial fixtures that should course of large volumes of high-temperature water, grease or chemical substances. The duplex drain pump can transfer as much as 140 gallons of fluid per minute, with both pumps mechanically activating simultaneously when the incoming flow price exceeds that of a single pump.
Other key options of the Sanicom 2 include:
Easy access for servicing: The Sanicom 2 has been designed to maintain upkeep to a minimum. If servicing is required, the 2 motors, electrical parts, pressure-level switches, and dip tubes are all readily accessible and easily removed.
Fail-safe activation: A fail-proof sensing mechanism system for detecting the water stage contained in the Sanicom 2 consists of three stress switches, every installed in its personal inner dip tube. With three totally different switches, it’s almost impossible for the unit to fail to activate with incoming fluids.
Control Panel: The unit comes outfitted with an exterior wired management panel with override buttons and LED energy and alarm indicators. An exterior alarm field is optional.
Nationwide Compliance: IAPMO-listed and carrying the UPC (Uniform Plumbing Code) logo, the Sanicom 2’s duplex know-how is an excellent match for lots of U.S. locales and jurisdictions.
Like the Sanicom 1 drain pump, the new duplex model can handle fluids as much as 194 degrees Fahrenheit (90 degrees Celsius), making it perfect for industrial-scale dishwashers, business washing machines, hydroponic crop growing, and some other commercial and industrial functions requiring wastewater evacuation. With horsepower scores larger than other Saniflo methods, the Sanicom 2 discharges effluent via a 1.5-inch pipe vertically 32 ft and/or horizontally 390 feet. The pump comes geared up with built-in check valves on the discharge of every motor.
Accommodating the brewery’s new bar, the Sanicom 2 pumps the wastewater from three fixtures 15-feet vertically and then 30-plus-feet horizontally through a 1.5-inch discharge pipe. At a quarter-inch slope per foot, the discharge then runs into the principle drain on the opposite aspect of the wall.
RESULTS

“Depending upon the length of your run right into a drain line, it may take as little as an hour to install the Sanicom 2,” says O’Leary approvingly. “But it was a twelve-hour job for us at the brewery, because we had a lot of piping to run and had to install venting.”

According to O’Leary, the set up was very easy and went easily for him and his staff. “We effortlessly linked the drain lines to the pump and installed a shut-off for the ejection facet for maintenance down the line,” he says, adding, “I was amazed how excessive and much the Sanicom 2 is prepared to pump the drain water to the sewer line, but the unit itself tucks right under the bar.”

Besides not obstructing the bartenders or the staff, the Sanicom 2 presents simply accessible electrical hookups, in accordance with O’Leary: “The electrician raved about how simple and straightforward it was to make connections.”

O’Leary stories that “the bar is now up and running, and the owner’s feedback has been unbelievably positive”—thanks in no small part to Saniflo’s heavy-duty industrial drain pumps and lifting station.
CLIENT CLOSE-UP: REVIVAL BREWING COMPANY

Revival Brewing Company is a centered on the brewmaster’s passion for distinctive and progressive craft beers, cultivated over twenty years of creating signature brews for the preeminent breweries in Rhode Island.
For extra information, go to www.revivalbrewing.com.
Share